Basic Principles of Television Engineering » Exercise – 1
8. Trace period of a horizontal line is :
(a) 64 μs
(b) 12 μs
(c) 52 μs
(d) 1280 μs
Explanation
Explanation : No answer description available for this question. Let us discuss.
Subject Name : Communication Engineering Exam Name : IIT GATE, UPSC ESE, RRB, SSC, DMRC, NMRC, BSNL, DRDO, ISRO, BARC, NIELIT Posts Name : Assistant Engineer, Management Trainee, Junior Engineer, Technical Assistant
Electronics & Communication Engineering Books
Related Posts Basic Principles of Television Engineering » Exercise - 1 2. Trace period of a horizontal line is : (a) 18720 μs (b) 1280 μs (c) 20 ms (d) None of the above Tags: basic, principles, television, engineering, μs, exercise, trace, period, horizontal, communication
Basic Principles of Television Engineering » Exercise - 118. Retrace period of a horizontal line is : (a) 64 μs (b) 12 μs (c) 52 μs (d) 20 μs Tags: μs, basic, principles, television, engineering, exercise, period, horizontal, communication
Basic Principles of Television Engineering » Exercise - 1 6. In India, horizontal blanking pulse is : (a) 12 μs (b) 4.3 μsec (c) 1280 μs (d) 1870 μs Tags: μs, basic, principles, television, engineering, exercise, horizontal, communication
Basic Principles of Television Engineering » Exercise - 123. India uses CCIR ………… standard. (a) B (b) I (c) L (d) M Tags: basic, principles, television, engineering, exercise, communication
Basic Principles of Television Engineering » Exercise - 124. The width of V-sync pulse in India is : (a) 4.8 μs (b) 64 μs (c) 100 μs (d) 160 μs Tags: μs, basic, principles, television, engineering, exercise, communication