Basic Principles of Television Engineering » Exercise – 1
1. Horizontal scanning frequency, according to CCIR standards is :
(a) 15750 Hz
(b) 15625 Hz
(c) 60 Hz
(d) 15725 Hz
Explanation
Explanation : No answer description available for this question.
Let us discuss.
2. Trace period of a horizontal line is :
(a) 18720 μs
(b) 1280 μs
(c) 20 ms
(d) None of the above
Explanation
Explanation : No answer description available for this question.
Let us discuss.
3. According to CCIR standards the field sync occurs after lines :
(a) 3121/2 and 625
(b) 262.5 and 625
(c) 310 and 662.5
(d) None of above
Explanation
Explanation : No answer description available for this question.
Let us discuss.
4. The interlaced scanning, there is one half line spacing between the start positions scanning odd and even fields. This is done to produce :
(a) Horizontal scanning
(b) Linear scanning
(c) exact interlacing
(d) line paring
Explanation
Explanation : No answer description available for this question.
Let us discuss.
5. The term pedestal is used for :
(a) Sync top level
(b) Blanking level
(c) Black level
(d) White level
Explanation
Explanation : No answer description available for this question.
Let us discuss.
Related Posts
Basic Principles of Television Engineering » Exercise - 1 6. In India, horizontal blanking pulse is : (a) 12 μs (b) 4.3 μsec (c) 1280 μs (d) 1870 μs Tags: μs, engineering, india, horizontal, blanking, communication
Basic Principles of Television Engineering » Exercise - 127. Vertical blanking uses ………….. μs duration in India. (a) 64 (b) 100 (c) 160 (d) 1280 Tags: engineering, blanking, μs, india, communication
Basic Principles of Television Engineering » Exercise - 1 1. Horizontal scanning frequency, according to CCIR standards is : (a) 15750 Hz (b) 15625 Hz (c) 60 Hz (d) 15725 Hz Tags: hz, engineering, horizontal, scanning, ccir, communication
Basic Principles of Television Engineering » Exercise - 124. The width of V-sync pulse in India is : (a) 4.8 μs (b) 64 μs (c) 100 μs (d) 160 μs Tags: μs, engineering, india, communication
Basic Principles of Television Engineering » Exercise - 118. Retrace period of a horizontal line is : (a) 64 μs (b) 12 μs (c) 52 μs (d) 20 μs Tags: μs, engineering, horizontal, communication