Basic Principles of Television Engineering » Exercise – 1
6. In India, horizontal blanking pulse is :
(a) 12 μs
(b) 4.3 μsec
(c) 1280 μs
(d) 1870 μs
Explanation
Explanation : No answer description available for this question. Let us discuss.
Subject Name : Communication Engineering |
Exam Name : IIT GATE, UPSC ESE, RRB, SSC, DMRC, NMRC, BSNL, DRDO, ISRO, BARC, NIELIT |
Posts Name : Assistant Engineer, Management Trainee, Junior Engineer, Technical Assistant |
Electronics & Communication Engineering Books
|
Related Posts
Basic Principles of Television Engineering » Exercise - 118. Retrace period of a horizontal line is : (a) 64 μs (b) 12 μs (c) 52 μs (d) 20 μsTags: μs, basic, principles, television, engineering, exercise, horizontal, communication
Basic Principles of Television Engineering » Exercise - 116. The width of H-sync pulse in India is : (a) 12 μs (b) 4.7 μs (c) 1870 μs (d) 1870 μsTags: μs, basic, principles, television, engineering, exercise, pulse, india, communication
Basic Principles of Television Engineering » Exercise - 1 8. Trace period of a horizontal line is : (a) 64 μs (b) 12 μs (c) 52 μs (d) 1280 μsTags: μs, basic, principles, television, engineering, exercise, horizontal, communication
Basic Principles of Television Engineering » Exercise - 124. The width of V-sync pulse in India is : (a) 4.8 μs (b) 64 μs (c) 100 μs (d) 160 μsTags: μs, basic, principles, television, engineering, exercise, pulse, india, communication
Basic Principles of Television Engineering » Exercise - 127. Vertical blanking uses ………….. μs duration in India. (a) 64 (b) 100 (c) 160 (d) 1280Tags: basic, principles, television, engineering, exercise, blanking, μs, india, communication