Basic Principles of Television Engineering » Exercise – 1
2. Trace period of a horizontal line is :
(a) 18720 μs
(b) 1280 μs
(c) 20 ms
(d) None of the above
Explanation
Explanation : No answer description available for this question. Let us discuss.
Subject Name : Communication Engineering |
Exam Name : IIT GATE, UPSC ESE, RRB, SSC, DMRC, NMRC, BSNL, DRDO, ISRO, BARC, NIELIT |
Posts Name : Assistant Engineer, Management Trainee, Junior Engineer, Technical Assistant |
Electronics & Communication Engineering Books
|
Related Posts
Basic Principles of Television Engineering » Exercise - 1 8. Trace period of a horizontal line is : (a) 64 μs (b) 12 μs (c) 52 μs (d) 1280 μsTags: μs, basic, principles, television, engineering, exercise, trace, period, horizontal, communication
Basic Principles of Television Engineering » Exercise - 118. Retrace period of a horizontal line is : (a) 64 μs (b) 12 μs (c) 52 μs (d) 20 μsTags: μs, basic, principles, television, engineering, exercise, period, horizontal, communication
Basic Principles of Television Engineering » Exercise - 1 9. The value of Kell factor is about ........ (a) 0.5 (b) 0.3 (c) 0.7 (d) 0.9Tags: basic, principles, television, engineering, exercise, communication
Basic Principles of Television Engineering » Exercise - 123. India uses CCIR ………… standard. (a) B (b) I (c) L (d) MTags: basic, principles, television, engineering, exercise, communication
Basic Principles of Television Engineering » Exercise - 121. Inter-carrier frequency in India is …………… (a) 6.5 (b) 6 (c) 5.5 (d) 5Tags: basic, principles, television, engineering, exercise, communication